| NIP171 | LS from ITU-R dtd 27 Feb 2017 titled “Addendum 3 to Circular Letter 5/LCCE/59 on candidate RIT proposals for IMT-2020 and their subsequent evaluation” | TSDSI-SG1-1-[NIP 171]-V1.0.0-20170926 | Accepted |
| NIP170 | LS in from ITU-R dtd 27 Feb 2017 titled “ITU-R WP 5D Workshop on IMT2020” | TSDSI-SG1-1-[NIP170]-V1.0.0-20170926 | Accepted |
| NIP166 | Potential conflict between the scopes of new SGs | TSDSI-SG1-NIP166-V1.0.0-20170731 | Accepted |
| NIP165 | Regulation aspects of 3GPP power class 2 device operations in B40 | TSDSI-SG1–[NIP165]-V1.0.0-20170530 | Approved |
| NIP164 | Transpose 3GPP Specs for IMT Adv (M.2012-3) | TSDSI-SG1–[NIP164]-V1.0.0-20170502 | Approved |
| NIP163 | IMT2020 RIT/SRIT Submission | TSDSI-SG1-NIP163-V1.0.0-20170419 | Accepted |
| NIP157 | Submission of RIT/SRIT for IMT2020 | TSDSI-SG1-NIP157-[WG1]-V1.0.0-20170416 | Accepted |
| NIP156 | Transposition of oneM2M specifications as TSDSI specifications | TSDSI-SG02-NIP156-V1.0.0-20170405 | Accepted |
| NIP148 | NIP for study item on FICaD | TSDSI-SG3-NIP148-[WG1]-V1.0.1-20170317 | Accepted |
| NIP147 | NIP for study item on Network Slicing | TSDSI-SG3-NIP147-[WG1]-V1.0.1-20170317 | Accepted |
| NIP152 | IMEI security issue in Indian network | TSDSI-SG4-NIP152-V1.0.0-20170311 | Accepted |
| NIP151 | The method to authenticate using ECC in M2M /IOT network | TSDSI-SG4-NIP151-V1.0.0-20170310 | Accepted |