- This event has passed.
SGSS Technical Plenary #36 (December 18 & 19, 2025)
Date – 18th – 19th December 2025
Time – 10 AM – 4 PM on both days
Mode – Online
Registrations – Kindly click here to register for the upcoming SGSS TP#36
Telecommunication Standards Development Society India
SG – Services & Solutions (TP#36_2025-26) E-Meeting
Date: 18th– 19th December 2025
Mode- Online
Draft Agenda
All the documents to be presented in this meeting are uploaded here
Joining Link for SGSS TP#36 – https://meet.goto.com/407027589
Day 1
| Date | Timings | Agenda |
| DAY #1: 18th December 2025
|
1000 to 1130
|
A. Opening Plenary Session [Chair SGSS]
1. Welcome & Approval of agenda and previous TP minutes 1.1. Read out TSDSI IPR Policy 1.2. Read out Anti-Trust policy of TSDSI 1.3. Read out Software Copyrights Policy of TSDSI 1.4. Review & Finalization of Agenda with Agenda Approval 1.5. Approval of MoM of 16th – 17th September 2025 SGSS TP#35 1.6. Approval of MoM of SGSS FCC 1st December 2025 1.7. Approval of MoM of SGSS FCC 9th December 2025 2. SGSS context sharing – updates since previous TP [Chair SGSS] 3. Items for early consideration 4. Summary of Email Discussions from September 2025 TP#35 5. NIP handling 5.1. NIP414 – PQC Migration Strategies for 5G and 6G Mobile Networks [Nokia] 5.2. NIP416 – Need for AI Explainability framework for 5G/6G [Tejas Networks] 5.3. NIP418 – AI-Native Digital Twin Architecture for Massive Digital Twinning in 5G/6G [TATA Elxsi] 5.4. NIP425 – Agentic AI framework for Autonomous Telco operations [TATA Elxsi] |
| 1130 to 1145 | Tea Break | |
| 1145 to 1315
|
6. Working Group 1: Security [WG1 chair]
6.1. WG1 Report – WG1 Chair 6.2. Approval of draft MoM of WG1 Call#10 26 Nov 2025 6.3. SI115 – 5G and 6G Beyond Network Security Architecture to support Multilevel End-to-End User Plane Security (NIP317) [C-DAC] 1. Final Technical Report [for approval of SGSS as cleared by WG1] 6.4. SI133- AI/ML-based Security Implementation in 6G Wireless Communication Systems (NIP349) [IIT Hyderabad] 1. SWIC1180 [Draft TR] – [IIT Hyderabad] 6.5. SI146 – PQC in embedded system to secure the connected devices for 6G [IDEMIA] 1. SWIC1185[Draft TR] – [IDEMIA] 6.6. SI156 – SDN-Based Optical Network for QKD: Secure and Adaptive Architecture [ERNET] 1. SWIC1210 [Draft TR] – ERNET 6.7. SI164 – Extension of SEAL for Authentication, Authorization, and Key Exchange of UAV/UAM-Hosted Applications and AI/ML Workloads in 5G/6G Networks [C-DOT] 1. SWIC1196 – [C-DOT] |
|
| 1315 to 1400 | Lunch Break | |
| 1400 to 1600
|
7. Working Group 2: Applications Layer [WG2 chair]
7.1. WG2 Report – WG2 Chair 7.2. Approval of draft MoM of WG2 Call#10 26 Nov 2025 7.3. SI143 – Public Safety Use Cases for 6G Networks (NIP369) [CEWiT] 1. SWIC1183 – [CEWiT] 2. SWIC1188 – [CEWiT] 7.4. WI1-NIP390 – Architecture and information flow to enable application-layer driven dynamic QoS provisioning for multi-user intelligent telerobotics and similar applications requiring exchange of multi-modal data traffic [TCS] 1. SWIC1181 – [TCS] 7.5. WI1-NIP310 – Integrated communication and sensing at the Application level [R-Jio] 1. SWIC1187 – [R Jio] |
|
| 1600 to 1700 | 8. Overflows from NIP handling session | |
|
End of Day 1 |
||
Day 2
| Date | Timings | Agenda |
| DAY #2:
19th December 2025 |
1000 to 1115
|
9. Joint Session with SGN [Exclusive Joining Link for Joint Session: https://meet.goto.com/496234493] Please come back to respective Study groups after joint session.
9.1. Global SDO Updates 9.1.1. 3GPP, ITU-R 9.1.2. ITU-T 9.1.3. oneM2M 9.2. Marcom Updates 9.3. SGN approach for 6G work [based on discussion held on 18th @ SGN] 9.4. Any other update needing attention of both the groups |
| 1115 to 1130 | Tea Break | |
| 1130 to 1315
|
10. Working Group 3: Services Architecture and Framework [WG3 Chair]
10.1. WG3 Report – WG3 Chair 10.2. Approval of draft MoM of WG3 Call#08 27 Nov 2025 10.3. SI101 – Enablement of common edge connectivity for public utility purposes (NIP 292) [IIT Delhi] 1. Revised SWIC1079 V3.1.0 [Draf TR] – [IIT Delhi] 10.4. SI126 – Study of Carrier Grade Linux Specification (NIP342) [C-DOT] 1. Revised SWIC1136 [Draft TR] – [C-DOT] 10.5. SI136 – Framework for AI/ML operation splitting in 6G context (NIP350) [TCS] 1. SWIC1184 [Draft TR] – TCS 10.6. SI140 – Service requirements and reference architecture for Railways Communications using 5G (NIP361) [Qualcomm] 1. Final Technical Report [for approval of SGSS as cleared by WG3] 10.7. SI141 – Study on Network Capabilities Exposure (NIP362) [Nokia] 1. SWIC1191 – [Nokia]
10.8. WI1-NIP374 – Technical standard and regulation for autonomous driving system [CDAC Trivandrum] 1. SWIC1186 – [C-DAC] 10.9. SI154 – AI-Enhanced Massive Digital Twinning Framework for Networks Supporting Sustainable Development Goals [TATA Elxsi] 1. Old SWIC1125 [Draft TR] – [TATA Elxsi] – For approval 10.10. SI159 – Technology recommendations for Telecom Service Providers to increase efficiency towards Capex/Opex (NIP398) [IIT Hyderabad] 1. Old SWIC1139 – [IIT Hyderabad] 2. New SWIC1212 – [IIT Hyderabad]
10.11. SI161 – Study on UAV communication and security standards for secure airspace control [TATA Elxsi] 1. SWIC1198 – [TATA Elxsi] 10.12. WI1-NIP410 – Data Management using Cloud Interoperability & Portability (CIP) Platform [R Jio] 1. SWIC1189 – [R Jio] 10.13. SI163 – Prioritized Role Based Service Delivery for UAV/UAM [C-DOT] 1. SWIC1197 – [C-DOT] 10.14. WI1-NIP328 – RBSA – Operational Framework and Marketplace Design [CDAC]
|
|
| 1315 to 1400 | Lunch Break | |
| 1400 to 1600
[May be extended by 30 minutes if overflow discussions take longer time] |
11. Overflow discussions – Technical topics postponed from previous sessions
12. Liaisons (Review Liaisons and Identify Actions) 12.1. Incoming Liaison [For information] 12.2. Outgoing Liaison 12.2.1. Draft TSDSI_8079_V1.0.0 – TSDSI TR 6042 V1.0.0 – Slice Identification in 5G RAN and Core for Scalable and Resilient Slice Services 12.2.2. Draft TSDSI_8080_V1.0.0 – TSDSI TR 6046 V1.0.0 – Interoperability of Multi-vendor QKD Hardware using SDN 12.2.3. Draft TSDSI_8081_V1.0.0 – TSDSI TR 6051 V1.0.0 – Study on Security Enabler for 6G 13. Percentage Status and expected completion date of the ongoing SGSS items. 14. Closing of the Plenary |
|
|
End of Day 2 (Feedback) |
||
Note1: The sequencing of the new proposals/contributions might change depending on the time taken by every item. Some of the items scheduled to be taken on Day 1 might move to Day 2
Plenary may be extended on either day by 30 to 60 minutes, if required
Members are requested to attend both days and keep themselves logged in the meeting.
Note2: More NIPs may be added in agenda before the meeting.