Home > Event > SGN Technical Plenary (August 10-11, 2021: Online)
Loading Events

« All Events

  • This event has passed.

SGN Technical Plenary (August 10-11, 2021: Online)

August 10, 2021 @ 10:00 am - August 11, 2021 @ 4:00 pm

Participation: Participation in the meeting is by prior registration here.

Agenda:

Day 1:

Date Timings Agenda Items
DAY #1: 10th August 2021

 

 

10:00 – 16:00

 

Tea Break:  10:45 am to 11:00 am

 

Lunch Break: 1:00 pm to 2:00pm

1. Introduction, announcements and approval of Agenda & Previous Minutes: 

1.1   Welcome, Introductions and Approval of Agenda

1.2   Read out the IPR policy of TSDSI

1.3   Approval of Minutes of the last SGN TP meeting#21 held on 24th and 25th May 2021

2. Summaries of Email Discussions from the May 2021 TP (All Email Threads started after last SGN TP on SGN Reflector):

2.1   SWIC 720 on Specification updates for 5Gi Rel. 16 (CEWIT) [WI 39.1] (Initiated by CEWIT)

2.2   SWIC 721 on Characterization of E-band Transmission in India (Astrome) [WI258.1] (Initiated by Astrome)

2.3   Inputs to the IMT 2020 roadmap (Initiated by Advisor-Networks)[Inputs from Advisor-Networks]

2.4   Summary of Email discussion initiated after last SGN TP#21 on Liaison Statement from ITU-R on “Working Document towards a draft new Report ITU-R M.[IMT.C-V2X]” (Chair, SGN)

2.5   “Liaison Statement to request for input for a draft revision of Recommendation ITU M.1801-2 from ITU-R WP5A” (Chair, SGN)

2.6  Email Discussion on minimum set of data required to help the Study in SI 73 and 74 [LS sent from TSDSI to WPC] (Chair, SGN)

2.7   Discussion on Work Completion Status in respect of SIs and WIs. (Initiated by Advisor-Networks)

3.  New Items proposals /Contributions as received.

3.1   NIP 268 on Feasibility of Open Source for IP Transport in 5G [Niral Networks] [Number reserved but document not received]

3.2   NIP 269 on Bandwidth aggregation for 5G TV Broadcast from the co-located UEs [IIT-KGP]

3.3   NIP 270 on Functional Split and Fronthaul Interface in FBS Driven C-RAN for 5G and Beyond [IIT-KGP]

3.4   NIP 271 on Open Radio initiative: Towards a Open, Disaggregated RAN [Reliance Jio]

3.5   SWIC 737 on Open Disaggregated RAN (for SI 81) [Sooktha]

3.6   SWIC 742 on Baseline Requirements and High Level Architecture for NIP226 (5G Extensions for Broadcast Offload) (WI1-NIP226) [Saankhya Labs]

End of Day 1

Day 2:

Date Timings Agenda Items
 DAY #2: 11th August 2021

 

10:00 AM onwards

 

Tea Break:  10:45 am to 11:00 am

 

Lunch Break: 1:00 pm to 2:00pm

3. New Items proposals /Contributions as received (Continued..)

3.7   SWIC 738 on Status report of SI73 [Reliance Jio]

3.8   SWIC 739 on SI74 status [Reliance Jio]

3.9   SWIC 740 on SI 70 Chapter 4 – contribution [Reliance Jio]

3.10  SWIC 743 on ToC of the study report (SI 89)

4. Liaison Statements

4.1 Incoming Liaison Statements:

4.1.1         Liaison Statement to External Organizations on Development of “IMT Vision for 2030 and beyond”

4.1.2         Liaison statement to GCS Proponents and Transposing Organizations on the provision of transposition references and Certification C for Draft Revision 5 of Recommendation ITU-R M.2012

4.1.3         Liaison statement to External Organizations engaged in Recommendation ITU-R M.2012 on the schedule for updating Recommendation ITU-R M.2012 to Revision 6

4.1.4         Liaison Statement to the external organizations on the schedule for updating Recommendation ITU-R M.2150 to Revision ‘AFTER YEAR 2021’

4.2   Outgoing Liaison Statement

4.2.1 LS to TEC regarding technical report on NB-IOT Capabilities for energy metering

5.  Any Other Items:

5.1   ITU-T SG-15 living lists (agenda item from ITU-R sub TF)

5.2   Identification of volunteers for briefing of the work ongoing in ITU (agenda item from ITU-R sub TF)

5.3 Action Items for Study Group from GC#33

5.4   Update on ITU-R WP5D#38 meeting

5.5 Update on 3GPP Release 18 RAN workshop

5.6 Adoption of transposed 3GPP Release 16 specifications by TEC

5.7 Adoption of CPRI Fronthaul Transport Standard as National Standard

5.8 SGN approval for M.2012 Revision 5 Transposition

End of Day 2 ( Requesting the participants to please fill the Feedback form)

Details

Start:
August 10, 2021 @ 10:00 am
End:
August 11, 2021 @ 4:00 pm
Event Category:

Venue

Online