
- This event has passed.
SGN Technical Planery (September 7-8, 2020: GoTo Meeting)
September 7, 2020 @ 10:00 am - September 8, 2020 @ 4:00 pm
Click here to register.
Draft Agenda:
AGENDA DAY #1
Date | Timings | Track #1 |
DAY #1:
7th September 2020 |
10:00 – 10:45 | SG – Networks e-Meeting Morning Session:
|
10:45 – 11:00 | TEA BREAK | |
11:00- 13:30 | 4. Discussion on SI 66- SWIP 676, SWIP 677 (Email Summary from May TP), SWIP 678 (TR)
5. WI on Fixed and Mobile Convergence with 5G Core (WI1-NIP 227) [Carried forward from the previous meeting.] (Further to Email discussion initiated by Mr Narayana,Wipro after the March 2020 meeting)-Summary Report of email discussion and way forward 6. SI 70 on 6G Radio Access network (NIP 235) (Outcome of the email discussion) 7. Extension of Broadcast Offload (WI1-NIP226) (First Draft of TR as per decision of last meeting) SWIP 679 8. Discussion on WI on Deployment 6 Option for 5G NR SA Mode [Carried forward from the previous meeting.] (WI-NIP224)(Further to Email discussion initiated after March TP by Mr Mahesh,RJio) |
|
13:30 – 14:30 | LUNCH BREAK | |
14:30-16:00 | 9. NIP 251 on Dynamic joint deployment of SDN Controllers and Hypervisors (Load and Latency Aware Joint Hypervisor Controller Deployment for 5G) by IIT-KHP
10 NIP 238/SI73 (Study of 6GHz Spectrum for wireless communication in India) [Email discussion (Summary Report)-approved as SI after email discussion as per chair’s mail dated “4th August 2020”] ((Status Report ppt) 11. NIP 246/SI74 on Study of 6 GHz spectrum for license-exempt wireless applications in India from RJio ((Status Report ppt) |
|
16:00 | End of Day 1 |
AGENDA DAY #2
Date | Timings | Track #1 |
DAY #2:
8th September 2020
|
10:00-10:45 | 1. Items from Day 1 to be revisited:
By JIO – Updated Status Report for SI73 – Updated Status Report for SI74 – Liaison Statement for SI73 and SI74 By CEWIT – SWIP 677 (Revised version of email summary from May TP) 2. Review of existing SI Status with little/no progress.(Further to email discussion after May TP) 3. Technical Reports of X2 and Relay enhancement [Comments received on Email] 4. NIP 248 on Evaluation of the existing IAB architecture in 5G Networks by IIT-B |
10:45-11:00 | TEA BREAK | |
11:00-13:30 | 5. NIP 249 on NB-IoT Performance Assessment for Metering and SCADA by Sensorise
6. NIP 253 on UAV Assisted C-RAN for 5G and beyond by IIT-KHP 7. NIP 250 on Bandwidth aggregation for 5G TV Broadcast from the co-located UEs: A physical layer prospective with FeMBMS and downlink broadcast control channel by IIT-KHP (Presentation) |
|
13:30-14:30 | Lunch Break | |
14:30-16:00 | 8. NIP 252 on EPON based back-hauling in 4G/5G networks to reduce hand-off latency by IIT-KHP
9. Email discussion Summary Report for NIP 237 on RIT assessment. 10. Status Report on WI1-NIP225 (NAVIC Support in cellular positioning ) Liaison Statements Incoming Liaisons From ITU-R 3) Submission of IPR Policy and Business Matters Forms From ITU-T Outgoing Liaisons 1) RESPONSE TO EVALUATION OF TSDSI RIT TOWARDS IMT-2020 BY 5GIA 2) RESPONSE TO EVALUATION OF TSDSI RIT TOWARDS IMT-2020 BY WWRF Any other Item |
|
16:00 | End of Day 2 |